Ongoing Projects

bipl

RE Wall Work – NH-927A (Rajasthan)

Design & Construction of RE Wall work for widening, strengthening and up-gradation to two-lane with paved shoulder from: Sagwara Bypass (Km 207.700–216.440) and Garhi Pratapurbypass (Km 227.470–244.080) on NH-927A in the State of Rajasthan.

RE Wall Work – NH-927A (Rajasthan)

Design & Construction of RE Wall work for widening, strengthening and up-gradation to two-lane with paved shoulder from: Sagwara Bypass (Km 207.700–216.440) and Garhi Pratapurbypass (Km 227.470–244.080) on NH-927A in the State of Rajasthan.

ROB at LC No. 407B – Jhansi–Gwalior Section

Construction of 2-lane Road Over Bridge in lieu of Level Crossing No. 407B at Km 1205/6–8 on the Jhansi–Gwalior Section.

ROB at LC No. 407B – Jhansi–Gwalior Section

Construction of 2-lane Road Over Bridge in lieu of Level Crossing No. 407B at Km 1205/6–8 on the Jhansi–Gwalior Section.

ROB at LC No. 208 – Kota–Mathura Section

Construction of 02-lane Road Over Bridge in lieu of LC No. 208 at Km 1149/00–02 between Hindaun City and Fateh Singhpura in the State of Rajasthan.

ROB at LC No. 208 – Kota–Mathura Section

Construction of 02-lane Road Over Bridge in lieu of LC No. 208 at Km 1149/00–02 between Hindaun City and Fateh Singhpura in the State of Rajasthan.

Railway Bridge – Gangapur City–Bayana Section

Construction of 2-lane Railway Bridge in lieu of LC No. 211 at Railway Km 1153/30–1154/2 between Fatehsinghpura and Dumariya stations on the Delhi–Mumbai. Railway Line.

Railway Bridge – Gangapur City–Bayana Section

Construction of 2-lane Railway Bridge in lieu of LC No. 211 at Railway Km 1153/30–1154/2 between Fatehsinghpura and Dumariya stations on the Delhi–Mumbai. Railway Line.

Kota–Mathura Section ROB (LC No. 246)

Provision of 2-lane Road Over Bridge (ROB) in lieu of LC No. 246 (TVU = 66732) at Km 1214/10–12 between BTE–DUM stations in the section of ADEN–BTE.

Kota–Mathura Section ROB (LC No. 246)

Provision of 2-lane Road Over Bridge (ROB) in lieu of LC No. 246 (TVU = 66732) at Km 1214/10–12 between BTE–DUM stations in the section of ADEN–BTE.

NH-58 VUP & LVUP Construction

Construction of VUP at Km 114/000, 134/000 & LVUP at Km 114/800, 129/490, 172/280 of NH-58 (Beawar–Gomti section) in the State of Rajasthan.

NH-58 VUP & LVUP Construction

Construction of VUP at Km 114/000, 134/000 & LVUP at Km 114/800, 129/490, 172/280 of NH-58 (Beawar–Gomti section) in the State of Rajasthan.